Go to a plan view click scope box on the create panel of the view tab.
Revit multiple floor plans with different demolition plans. About half of the floor plan is about 2 above the other half. You can simply call them phase1 phase2 or use more descriptive terms. For type select a view type from the list or click edit type to modify an existing view type or create a new view type. Add another view to your project or duplicate an existing view.
However i need to keep all the phasing projects within one file so that the owner has a complete revit model once all the phases have been complete. 4 comments aug 26 2020. You are now set to create a scope box in a floor plan view. New floor plan showing new work and existing use phase filter show previous plus new demo floor plan show existing and demo work use phase filter show previous plus demo and set phase to new work.
Check the height of the scope box you require. Additionally building 401 has three large concrete silos and the building floor is a concrete slab. Set the view direction parameter differently for each structural plan view to allow multiple view directions within a project. However in my drawing set both levels are shown in one floor plan and there.
14 beginner tips to create a floor plan in revit. 4 comments aug 19 2020. I set up a separate demo plans new plans and existing along with the three types of elevations with these settings in my template. Building demolition plan document no.
Select one or more levels for which you want to create a plan view. So i have a floor plan that is on two different levels. Nfss 0010 revision rev 0 tes 2 august 2010 w912p4 07 d 0003 0002 rev 0 multiple floors which contain rooms and offices and building service areas boiler rooms and tower areas. Engineers view plans at different orientations in different countries.
Click view tabcreate panelplan views drop down and then click floor plan reflected ceiling plan structural plan in the new plan dialog. On the options bar enter a name and specify a height for the scope box hopefully you ve checked the height. Make sure you have multiple levels set up in your project. I am working on a very large project in which the owner needs different sets to be issued at different phases for permitting and client financial issues.
This is starting to cause a lot of annoying visibility and family placement issues so i had to make a separate working view just showing the elevated portion by itself so i can place families etc. If you have a big project with multiple construction phases create as many phases as required.